Counties :
Andrew County
Maintenance Projects:
Construction Projects:
Route 59/Business 71: Resurfacing with Superpave on the driving lanes and shoulders will be done from the Interstate 29 interchange to Business Loop 29 near St. Joseph for a length of 1.759 miles. Coldmilling and resurfacing with Superpave and pavement repair will also be done from Interstate 29 interchange to Price Street near Savannah for a length of 5.791 miles. Drivers should expect intermittent lane closures. This project is essentially completed.
Back to Top
Atchison County
Maintenance Projects:
Construction Projects:
Interstate 29: Hot-in-place recycling is being done on I-29. The project started in May from the Iowa State line south to Route 111 at Rock Port. The resurfacing project will utilize the hot-in-place recycling method in which asphalt pavement surfaces are corrected by softening the existing surface with heat, then mechanically removing the pavement surface, mixing it with a recycling or rejuvenating agent, possibly adding virgin asphalt and/or aggregate, and replacing it on the pavement without removing the recycled material from the existing roadway. The contractor on this project will be Ideker Corporation of St. Joseph. This project is currently in progress.
Back to Top
Buchanan County
Maintenance Projects:
U.S. 36: Area maintenance crews will be doing concrete replacement on U.S. 36 Hwy. between Interstate 29 and 10th Street in various locations in the westbound lanes throughout the next two weeks. The road will be narrowed to one lane during this time.
Construction Projects:
Back to Top
Caldwell County
Maintenance Projects:
Construction Projects:
Route 13: A resurfacing project began on Route 13 in Caldwell County on October 9th. The section of Route 13 between Business 36 in Hamilton to Kingston is completed. In late October, work began on the section of Route 13 from Kingtson south to Route V near Polo. During this resurfacing project, Route 13 will be narrowed to one lane and motorists will be guided through the work zone by a pilot car. The contractor on the project is Ideker, Inc. of St. Joseph.
Clinton County
Maintenance Projects:
U.S. 36 -
Beginning Tuesday, October 28th (weather permitting) roadwork will be done in the east and westbound lanes between Cameron and Hamilton. Work is expected to take two weeks to complete. The road will be narrowed to one lane around the work zone. Motorists are reminded to reduce their speed and drive with caution through this area.
MO 116: The week of November 17th area maintenance crews will be doing shoulder work on MO 116 from Route C to US 69 Hwy. Flaggers will direct motorists around the work zone.
Construction Projects:
Back to Top
Daviess County
Maintenance Projects:
Construction Projects:
Back to Top
Dekalb County
Maintenance Projects:
Construction Projects:
Gentry County
Maintenance Projects:
Construction Projects:
Back to Top
Harrison County
Maintenance Projects:
Route 13 - Area maintenance crews will be working on the substructure of the Little Pole Cat Bridge and the Pole Cat Bridge. The bridges are located on Route 13 between Interstate 35 and Route 136. The work on the bridges will continue throughout the month of November (weather permitting.) The bridges will be narrowed to one lane during working hours. Temporary traffic signals will be in place to direct motorists through the work zone. Motorists are reminded to use extreme caution when driving through active work zones.
Construction Projects:
Back to Top
Holt County
Maintenance Projects:
Interstate 29: Area maintenance crews will begin their final mowing of the season on Interstate 29 in Holt and Atchison County next week (weather permitting.) Crew workers will be mowing the shoulders and the medians on the north and southbound lanes. Mowers will be off the roadway and there should be no disruption to Interstate travelers. The final mowing in the two counties is expected to be completed by November 1st (weather permitting.)
Construction Projects:
Interstate 29: Hot-in-place recycling will be done on I-29 beginning in May from Mound City south to Route 59 near Oregon. The resurfacing project will utilize the hot-in-place recycling method in which asphalt pavement surfaces are corrected by softening the existing surface with heat, then mechanically removing the pavement surface, mixing it with a recycling or rejuvenating agent, possibly adding virgin asphalt and/or aggregate, and replacing it on the pavement without removing the recycled material from the existing roadway. The contractor on this project will be Ideker Corporation of St. Joseph. This project is in progress.
Back to Top
Nodaway County
Maintenance Projects:
Route E: Beginning on Wednesday, November 12th (weather permitting) area maintenance crews will be asphalt patching in various locations on Route E between US 136 and MO 246 near Hopkins. The work is scheduled to take three days to complete. The road will be narrowed to one lane and flaggers will direct motorists around the work zone.
Construction Projects:
Back to Top
Worth County
Maintenance Projects:
Construction Projects: