Disctrict 9 South Central Welcome to MoDOT Contact, Survey, Jobs, News, Site Map
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

mapStatewide Work Zones

  Counties:

 

All work subject to change due to weather or priority adjustments. Motorists are urged to exercise caution while passing through work zones. Workers may be on or near the roadway. Signs will be posted and flag persons will be present in areas where traffic will be impacted. Please contact the MoDOT Customer Service Center by calling the toll-free number 1.888.ASK.MoDOT (275.6636).

Receive FREE email updates

PDF File: Week of December 1, 2008

Interstate 44:
Crawford County

Interstate 44:

MoDOT crews will cut brush and trim trees on the right-of-way.
Location: OUTER ROAD of I44 from the junction of Route UU to the junction of Route H.

Phelps County
Interstate 44:
Contractor crews will be painting the Arlington Bridge over the Little Piney River, eastbound, mile
marker 174.
Pulaski County
Interstate 44:
Contractor crews will be performing joint repairs/sealing of the bridge over Roubidoux Creek on I44
east bound lane and the bridge over Hooker Creek on I44 east and west bound lanes.

Carter County

Construction Project

Route 60:
Contractor crews are paving new west bound lanes from 1 mile west of Hwy C to 2 miles east of
Route J.

Roadway Maintenance

Route 60:
MoDOT crews will cut brush and trim trees on the right-of-way.
Location: From the junction of Route J to the junction of Hwy 21.
Route D:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Location: From the junction of Hwy 60 to the junction of Hwy 21.

Carter County & Ripley County

Roadway Maintenance

Route 21:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Location: From the junction of Hwy 60 in Carter County to the junction of Route O in Ripley County.

Return to top

Crawford County

Roadway Maintenance
Interstate 44:
MoDOT crews will cut brush and trim trees on the right-of-way.
Location: OUTER ROAD of I44 from the junction of Route UU to the junction of Route H.
Route O:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Location: From the junction of Hwy 19 to the end of state highway maintenance.

Crawford County & Iron County

Roadway Maintenance

Route 49:
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on the shoulders.
Location: From the junction of Hwy 19 in Crawford County to the junction of Route Y in Iron County.

Return to top

Dent County

Roadway Maintenance
Route 19:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.

Location: From the Shannon County Line to the Crawford County Line.

Return to top

Howell County
Construction Project
Route 60:
Contractor crews have opened the new 4 lane from Willow Springs, Mo. to Mountain View, Mo. and will continue the final clean-up.

Roadway Maintenance

Route 60:
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on the shoulders.
Location: From the junction of Route NN to the city limits of Mountain View, Mo.
Route ZZ:
MoDOT crews will cut brush and trim trees on the right-of-way, will perform work to improve drainage and will make repairs to driveways and entrances.
Location: From the junction of Hwy 63 to the junction of County Road 9790.

Howell County & Texas County

Roadway Maintenance

Route 60:
MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.
Location: In Howell County from the junction of Route AM to the Texas County line and in Texas
County from the Howell County line to Hwy 181.

Return to top

Iron County

Roadway Maintenance

Route KK:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Location: Entire route.

Iron County & St. Francois County

Construction Project

Route 221:
Contractor crews are extending culverts, adding shoulders and constructing both centerline and
edgeline rumblestrips.
Location: Extends from Route 21 in Iron County to Route 67 near Farmington, Mo.

Return to top

Oregon County

Roadway Maintenance
Route 142:
MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.
Location: The city of Thayer, Mo. sidewalk project, working near the Thayer High School.
Route 160:
MoDOT crews will cut brush and trim trees on the right-of-way.
Location: From the junction of Hwy 19 to the Ripley County Line.
Route 63:
MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.
Location: From the north side to the south side of Koshkonong, Mo City limits.
Various Routes:
MoDOT crews will make repairs to driveways and entrances.

Return to top

Phelps County

Construction Project

Interstate 44:
Contractor crews will be painting the Arlington Bridge over the Little Piney River, eastbound, mile
marker 174.

Roadway Maintenance

Route 63:
MoDOT crews will patch potholes to restore shape and roadway stability.
Location: From the junction of Route W to the Maries County line.
Various Routes:
MoDOT crews will cut brush and trim trees on the right-of-way, patch potholes to restore shape and roadway stability and will replace, install and or maintain roadway signs. Crews will be patching and filling cracks at various bridges in Phelps County.


Return to top

Pulaski County

Construction Project

Interstate 44:
Contractor crews will be performing joint repairs/sealing of the bridge over Roubidoux Creek on I44
east bound lane and the bridge over Hooker Creek on I44 east and west bound lanes.

Roadway Maintenance

Route 17:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Location: From the north end to the south end of Crocker, Mo.
Route 17:
MoDOT crews will perform milling on the roadway. Milling removes excess material from cracks and
joints.
Location: Hwy 17 north.
Various Routes:
MoDOT crews will replace, install and or maintain roadway signs.

Return to top

Reynolds County

Roadway Maintenance

Route 21:
MoDOT crews will install an edge ribbon on the roadway. An edge ribbon restores the shoulder and
eliminates shoulder drop-off.
Location: From Ellington, Mo. south to the Carter County line.
Route 72:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Location: Entire route.

Return to top

Ripley County

Roadway Maintenance

Route 142:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Location: At the junction of of Route EE.
Route 160:
MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.
Location: From the junction of Route J to the junction of Route V.
Route T:
MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and
maintains stablility and proper drainage of water from the travel lanes.
Location: At the junction of Hwy 160 east.

Return to top

Shannon County

Construction Project
Route 19:
Contractor crews have set up a designated area for equipment crossing at the junction of Hwy 60
and Hwy 19 north.
Route 60:
Contractor crews are performing grading, drainage and pavement work.
Location: From the junction of Hwy 99 to the junction of Hwy 19.

Return to top

Texas County

Roadway Maintenance
Route 17:
MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or
other material in ruts along the edge of the roadway.
Location: From the junction of Hwy 63 south to the junction of O Hwy.
Route 17:
MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on the shoulders.
Location: From the junction of Hwy 63 north to the junction of Route AW.


Return to top

Washington County

Roadway Maintenance

Route E:
MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.
Location:
From the junction of Hwy 21 to the Madison County Line.

 

Return to top

   
   
CONTACT CONTACT CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP Kansas City Area Southwest District North Central District Central District Springfield Area Northeast District St. Louis Area South Central District Southeast District Northwest District