Bollinger
County
Construction Projects
Route 72 - Apex Paving widening and relocating a curve just west of the Sale Barn in Patton. The contractor will haul dirt from a borrow area across from Meadow Heights School. Drivers can expect trucks entering and leaving the area daily as work continues on the relocation. Traffic in this area will also be reduced to one lane, so motorists should expect some delays.
Roadway Maintenance
Route 34 in Bollinger County will be reduced to one lane while Missouri Department of Transportation crews perform drainage repairs. This section of roadway is located from Route ZZ to Route 51.Weather permitting, the work will take place Tuesday, Dec. 2 from 8:30 a.m. to 3:00 p.m.
Back to Top
Butler County
Construction Projects
Roadway Maintenance
Route 51 in Butler County will be reduced to one lane while MoDOT crews patch the roadway. This section of roadway is location from Route 53 to Route N.Weather permitting, traffic will be reduced to one lane Tuesday, Dec. 2 thru Friday, Dec. 5 from 8:00 a.m. to 3:30 p.m.
Route M in Butler County will be closed while MoDOT crews replace a pipe beneath the roadway. Route M will be closed between County Road 462 and County Road 451. Weather permitting, the repairs will take place Wednesday, Dec. 3 from 8:00 a.m. to 2:00 p.m.
Back to Top
Cape Girardeau County
Construction Projects
Route 34/72 - County Road 328 will remain closed for the next couple of months while the contractor is placing new concrete pavement. Route 34 will be reduced to one lane from County Road 335 to the Route 34/72 intersection for concrete paving. Lane reductions are in place at the Route 34/72 intersection while paving is underway. Concrete pavement construction resumes Monday, Sept. 22, weather permitting. Gaines Construction will be pouring concrete at approximately 7 a.m. Traffic will be reduced to one lane with delays expected. Work will continue through Tuesday. Work will then focus on preparing to move eastbound traffic to the new concrete pavement starting just east of the Cane Creek Bridge to County Road 335, where the four-lane project was completed last year. Traffic is expected to be shifted near the end of this month. Westbound traffic will not be affected at this time. MoDOT again encourages drivers to take alternate routes, carpool or avoid peak travel times (between 6 and 8 a.m. and 3 and 6 p.m.) if possible to lessen those impacts. Work should be complete by the end of the year.
A contractor hired by MoDOT began installing guardcable in late June.Installation is planned to continue through mid November. Southbound I-55 traffic will be reduced to one lane from 6:00 a.m. to 6:00 p.m. daily.The guardcable installation will be a moving operation from Route E at Oak Ridge to Route 60 at Sikeston and should continue thru Dec. 12. The entire project includes installing high-tension guardcable in the median along the southbound lane side of I-55. Motorists are urged to use extreme caution in the work zone.
Roadway Maintenance
The southbound Fruitland rest area located on Interstate 55 in Cape Girardeau County will be closed while MoDOT crews perform concrete repairs. Weather permitting, it will close while repairs are made Monday, Dec. 1 at 7:30 a.m. and will reopen Friday, Dec. 5 at 4:00 p.m.
Route 25 in Cape Girardeau County will be reduced to one lane while MoDOT crews perform drainage work in southbound lane. This section of roadway is located from Route 77 to County Road 249 at Bloemeyer.Weather permitting, the work will take place Tuesday, Dec. 2 thru Thursday, Dec. 4 from 8 a.m. to 5 p.m. daily.
Interstate 55 in Cape County will be reduced to one lane with a 20 width restriction while MoDot crews perform shoulder repairs in the north and southbound lanes.This section of roadway is located three quarters of a mile north of Route E overpass.Weather permitting, the work will take place Wednesday Dec. 3 thru Friday, Dec. 5 from 7:30 a.m. to 4:00 p.m. daily.
Back to Top
Dunklin County
Construction Projects
Roadway Maintenance
A section of Route 412 in Dunklin County will be reduced to one lane while MoDOT crews perform core drilling in the eastbound lane.This section of roadway is located from Route V to Route NN. Weather permitting, traffic will be reduced to one lane Tuesday, Dec. 2 from 7:00 a.m. to 4:00 p.m.
Back to Top
Madison County
Construction Projects
Route 67--A contractor hired by MoDOT is working on Route 67 to construct additional lanes for the upgrade to four lanes in Madison, Wayne and Butler Counties. Currently most of the activity is grading work from Route E to the Wayne County line. Drivers should be cautious of trucks entering and leaving the roadway. The work is expected to be completed in late 2010.
Route 67 from County Road 412 to County Road 411 will be reduced to one lane starting Tuesday, Sept. 2, as work progresses on the Route 67 four-lane improvements in Madison County. Excavation will take place to the east of existing Route 67 and must be hauled to the west of the existing highway to build the embankment for the new lanes. Drivers can expect possible five-minute delays at the flagger-controlled work zone from 6:30 a.m. to 7 p.m. The equipment crossing is expected to be in place through the end of October.
Route 72 from the Highway 67 East Outer Road to Kingsbury Boulevard will be reduced to one lane as Bross Construction starts shoulder work. Traffic will be reduced to one lane between 6 a.m. and 8 p.m. daily with both east and westbound lanes affected at various times with lane closures. The project is the first phase of relocating Route 72 north of its current intersection with Route OO and constructing a roundabout at Fredericktown. Completion is expected in fall 2008.
Route 72 traffic at Fredericktown will be shifted to the north of the existing lanes and through the center of the new roundabout construction. The traffic switch is necessary as work continues on the roundabout to construct the southern portion where traffic has been flowing. Motorists may expect reduced speeds through the work zone and are urged to use caution as workers and equipment may be working close to the travel lanes.
County Road 402 in Madison County will be closed to thru traffic from Route 67 starting Wednesday, July 30, at 7 a.m., weather permitting. County Road 402 is located just north of the intersection of Route A and Route 67. The closure is necessary as grading to build the new lanes of Route 67 progresses from just south of Fredericktown to the Madison/Wayne County line.
Route 67 – Bross Construction resurfacing and installing guardrail. Traffic reduced to one lane in various locations daily from 7 a.m. to 7 p.m.
Location: Cherokee Pass in Madison County to the Butler County line.
Estimated completion: Late summer 2008
Contact: Resident Engineer Steve Bubanovich, (573) 840-9781, (888)
275-6636.
As Route 67 lane improvements continue in Madison County, equipment will be crossing Route 67. Weather permitting, the equipment crossings are expected to take place Thursday, Oct. 30 through Wednesday, Dec. 31.Traffic through the work zone will be flagger controlled. When equipment is crossing, travelers can expect up to five-minute delays between the hours of 6:30 a.m. and 7 p.m. daily.There will also be an eleven foot width restrictionThe equipment crossings will be located between County Roads 411 and 412 one and a half miles north of Route N and also between one and a half miles to two and a half miles south of Route N.
Roadway Maintenance
Back to Top
Mississippi County
Construction Projects
Roadway Maintenance
Route 77 in Mississippi County will be closed while MoDOT crews replace a pipe beneath the roadway.This section of roadway is located four tenths of a mile south of Route D to County Road 314. Weather permitting, the repairs will take place Tuesday, Dec. 2 from 8:00 a.m. to 4:00 p.m.
Interstate 57 in Mississippi County will be reduced to one lanewhile Missouri Department of Transportation crews perform concrete repairs in the southbound lane. This section of roadway is located from Route B to Route CC.Weather permitting, traffic will be reduced to one lane starting Tuesday, Dec. 2 at 12:00 p.m. and will reopen Thursday, Dec. 4 at 4:00 p.m.
Route 75 in Mississippi County will be closed while MoDOT crews replace a pipe beneath the roadway.This section of roadway is located between Mo. 105 and County Road 343. Weather permitting, the repairs will take place Wednesday, Dec. 3 from 8:00 a.m. to 4:00 p.m.
Back to Top
New Madrid County
Construction Projects
Roadway Maintenance
Interstate 55 in New Madrid County will be reduced to one lane while Missouri Department of Transportation crews perform concrete repairs in the northbound and southbound lanes. The section of roadway in the northbound lane is located from one mile south of Route 80 to Route 80. Weather permitting, traffic will be reduced to one lane Monday, Dec. 1 at 8:00 a.m. and will reopen Wednesday, Dec. 3 at approximately 4:00 p.m.The section of roadway in the southbound lane is located from two miles south of Route 80 to Route P. Weather permitting, traffic will be reduced to one lane Monday, Dec. 1 at 8:00 a.m. and will reopen Friday, Dec. 5 at approximately 4:00 p.m.
Back to Top
Pemiscot County
Construction Projects
Roadway Maintenance
Route P in Pemiscot County will continue to be reduced to one lane while MoDOT crews perform routine bridge repairs. This section of roadway is located from Route A to County Road 250 at Bragg City. Weather permitting, this section of roadway will be closed Monday, Nov. 24 thru Tuesday, Nov.25 and again Monday, Dec. 1 thru Thursday, Dec. 4 from 7:30 a.m. to 4:00 p.m. daily.
Route J will be closed while Burlington Northern crews replace railroad tracks on Route J in Pemiscot County. This section of roadway is located between County Road 405 and County Road 408.The road will be closed Tuesday, Dec. 2 from 8:00 a.m. to 3:30 p.m. Motorists will need to take alternate routes while the repairs are being made.
Interstate 55 in Pemiscot County will be reduced to one lane with a 18 foot width restriction while MoDOT crews perform concrete repairs in the southbound lane. This section of roadway is located one tenth of a mile south of Route O (exit 1) and extends for one mile.Weather permitting, traffic will be reduced to one lane Monday, Dec. 1 at 8:00 a.m. and reopen Friday, Dec. 5 at 3:00 p.m.
Back to Top
Perry County
Construction Projects
Roadway Maintenance
Back to Top
Scott County
Construction Projects
A contractor hired by MoDOT began installing guardcable in late June.Installation is planned to continue through mid November. Southbound I-55 traffic will be reduced to one lane from 6:00 a.m. to 6:00 p.m. daily.The guardcable installation will be a moving operation from Route E at Oak Ridge to Route 60 at Sikeston and should continue thru Dec. 12. The entire project includes installing high-tension guardcable in the median along the southbound lane side of I-55. Motorists are urged to use extreme caution in the work zone.
Roadway Maintenance
Route 77 in Scott County will be reduced to one lane with a 16 foot width restriction while MoDOT crews make repairs to the shoulders.This section of roadway is located between the outer roads, on the bridge over Interstate 55 at Benton, Mo. They will also be working on the Interstate 55 ramps.Weather permitting, the work will take place Monday, Dec. 1 thru Wednesday, Dec. 3 from 8:00 a.m. to 5:00 p.m. daily.
Southbound I-55 in Scott County will be reduced to one lane with a 16 foot width restriction while MoDOT crews make repairs to the shoulders.The section of roadway is located between the Route C overhead and the Route H overhead.Weather permitting, the work will take place Wednesday, Dec. 3 thru Friday, Dec. 5 from 7:30 a.m. to 4:30 p.m. daily.
Route Z in Scott County will be closed while MoDOT crews replace drainage pipes beneath the roadway. This section of roadway is located from Route ZZ to Route Y near Salcedo. Weather permitting, Route Z will be closed Friday, Dec. 5 and Monday, Dec. 8 from 7:30 a.m. to 5:00 p.m. daily.
Back to Top
St. Francois County
Construction Projects
Temporary median crossovers will continue to be in use next week as Route 67 traffic is moved from the northbound lanes to the southbound lanes at 7 a.m. on Monday, November 24, weather permitting.Northbound Route 67 will be reduced to one lane with two lanes available for southbound traffic between Stormy Lane and the Route 47 Interchange at Bonne Terre. Traffic signals at Orchard Road will still be in operation. The change to traffic is necessary as excavation and bridgework begins across the northbound lanes for the new underpass at Orchard Road for the new interchange. Traffic is expected to be on the southbound lanes for about six weeks, with full four-lane availability resuming early next year, weather permitting.
Route 221 will be reduced to one lane on the bridge over the St. Francis River, approximately 1 mile south of Farmington on Route 221 for bridge repairs. Temporary traffic signals, barrels and work zone signing will be in place around the clock to direct traffic through the work area. Motorists should expect delays of 5 to 10 minutes throughout the duration of the lane closure.
Roadway Maintenance
Northbound Route 67 in St. Francois County will be reduced to one lane as MoDOT crews perform routine bridge maintenance. Weather permitting, traffic will be reduced to one lane Tuesday thru Friday, starting Dec. 2 and ending Jan. 9, 2009 from 7:00 a.m. to 5:00 p.m. daily. This section of roadway is located between Route DD and Route H, the bridge over St. Francois River.
Route 67 south in St. Francois County will be reduced to one lane while MoDOT crews perform joint repairs. The repairs will be made in the southbound lanes from Parkway Road to Route W. Weather permitting, the repairs will be made Monday, Dec. 1 thru Wednesday, Dec. 3 from 7:30 a.m. to 4:00 p.m. daily.
Back to Top
Ste. Genevieve County
Construction Projects
Roadway Maintenance
Interstate 55 in Ste. Genevieve County will be reduced to one lane while MoDOT crews perform guardrail repairs. The section of roadway is located in the southbound lane from Route 32 and Route N.Weather permitting, the work will take place Tuesday, Dec. 2 from 7:30 a.m. to 4:00 p.m.
Back to Top
Stoddard County
Construction Projects
Route 60 in Stoddard County will be reduced to one lane while Construction crews perform bridge construction in the eastbound and westbound lanes. This section of roadway is located from Route 51 to Route DD. Weather permitting, traffic will be reduced to one lane at various locations Tuesday, Dec. 2 and Wednesday, Dec. 3 from 7:00 a.m. to 4:00 p.m.
Roadway Maintenance
Route A in Stoddard County will be reduced to one lane while MoDOT crews perform routine bridge maintenance. This section of roadway is located between County Road 754 and Route CC. Weather permitting, the work will take place Monday, Dec. 1 thru Thursday, Dec. 4 from 7:00 a.m. to 4:00 p.m.
Route A in Stoddard County will be closed while MoDOT crews perform routine bridge maintenance. This section of roadway is located between County Road 752 and Route CC. Weather permitting, the work will take place Tuesday, Dec. 2 thru Thursday, Dec. 4 from 8:00 a.m. to 3:00 p.m. daily.
Wayne County
Construction Projects
Route 67 - An equipment crossing will be in place on Route 67 just north of Greenville. Traffic will be controlled by a new set of traffic signals installed on Route 67. Weather permitting, drivers should see the signals and the equipment crossing on Monday, Oct. 20, and it should continue in this area until the end of the year. Travelers should expect up to six-minute delays between the hours of 7 a.m. and 6 p.m. daily, including weekends.
Route 67 – Robertson Contractors Inc. is nearing completion of the new four-lane bridge over Lake Wappapello south of Greenville. Completion is expected later this fall.
Roadway Maintenance
Route D in Wayne County will be reduced to one lane while MoDOT crews perform shoulder repairs in the westbound lane. This section of roadway is located from Route BB to Route Z.Weather permitting, the work will take place Tuesday, Dec. 2 and Wednesday, Dec. 3 from 8:30 a.m. to 4:00 p.m. daily.